SAMPLE BID PACKET for a fictional contractor (Sample Site Works, LLC, Montpelier VT), for lead #1 of the
sample report. The notice, solicitation, past awards, and wage rates are real, from SAM.gov and USAspending.gov, as of November 6, 2026. On Pro, you get one of these by replying "bid on #N".
Bid Packet: Snow Removal Services, Westville Lake, Southbridge, MA
Lead #1 from the 2026-11-03 weekly report ·
Sol# W912WJ27QA006 · Solicitation posted 2026-10-30 · built 2026-11-06
Bid with a local sub
This is plain snow plowing and shoveling at a dam, a storage building, an access lane and a small trail parking lot, which Sample Site Works already does with its own plow trucks. It is a total small business set-aside under NAICS 561730, so the company is eligible. The site is about 204 miles from Montpelier, and the work requires access by 7:00 AM daily plus plowing on nights, weekends and holidays during storms, so it cannot be run from home base. A local small plow operator near Southbridge/Sturbridge can do the field work while Sample Site Works manages the contract, safety paperwork and quality control. This is a small job for this customer (one winter, unit-priced per storm), so it is worth it only if a local sub with a signed teaming letter can be lined up before the 16 Nov 2026 due date.
What it's worth
Est. $6.8k–$18k/yr from 5 past awards for the same work:
Wage rates
Cited in the solicitation: SCA wage determination 2015-4103, revision 36. View it on SAM.gov.
| Trade | Base/hr |
|---|
| Truckdriver, Light | $22.48 |
| Truckdriver, Medium | $23.60 |
| Truckdriver, Heavy | $29.62 |
| Heavy Equipment Operator | $37.05 |
| Tractor Operator | $27.20 |
| Laborer, Grounds Maintenance | $23.07 |
| Laborer | $21.30 |
Plus health & welfare $5.92/hr for every worker (up to 40 hrs/week).
Service Contract Act WD cited in Section H of the solicitation; covers Southbridge, Worcester County, MA.
SCA lines have no per-trade fringe; every listed occupation also gets health and welfare of $5.92/hour (up to 40 hours/week), 2 weeks paid vacation after 1 year, and 11 paid holidays. Use the truckdriver class that matches the plow truck's size. EO 13706 paid sick leave applies (1 hour per 30 worked, up to 56 hours/year). These rates bind any subcontractor's workers too.
Federal minimums for pricing labor; the full WD lists every trade.
Key dates
- 2026-10-29: Solicitation issued (posted on SAM.gov 2026-10-30) (SF 1449 block 6, Solicitation W912WJ27QA006.pdf p.1)
- Before 2026-11-16 (by arrangement): Site visit: contact TPOC Keith Beecher, 978-318-8405, keith.w.beecher@usace.army.mil; no site visits after the solicitation closes (PWS A.3 p.6 and Section L Site Visits p.36, Solicitation W912WJ27QA006.pdf)
- Not stated: Questions deadline: none given; send questions to the Contract Specialist as early as possible (Section L Questions Regarding Solicitations p.35-36, Solicitation W912WJ27QA006.pdf)
- 2026-11-16 02:00 PM local: Quotes due by email to Jennifer Samela (SF 1449 block 8 p.1 and Section L Quote Submission p.36, Solicitation W912WJ27QA006.pdf)
- Within 14 days of award: Pre-work submittals due (ENG 6293 APP worksheet, AHA, ENG 6282 SSHO letter, First Aid/CPR certificates); no field work until accepted (PWS A.4 and B.2.a, Solicitation W912WJ27QA006.pdf p.6, p.11)
- Within 30 days of award: Security awareness training (antiterrorism, suspicious activity reporting) completed for all contract personnel (Section H Security Requirements, Solicitation W912WJ27QA006.pdf p.20)
- Contract award to 2027-04-30: Period of performance (PWS A.4 Schedule, Solicitation W912WJ27QA006.pdf p.6)
Do now
- Confirm the SAM.gov registration is Active and that NAICS 561730 (Landscaping Services, $9.5M size standard) is listed in your reps and certs; have your UEI and CAGE code ready for Section L and the survey.
- Find a small plow operator near Southbridge/Sturbridge, MA who can reach Westville Dam and the Grand Trunk Trail lot by 7:00 AM; get their per-storm prices for all four snowfall tiers and a signed teaming letter, since the survey requires the sub's name, POC and location or the quote is rejected.
- Call TPOC Keith Beecher (978-318-8405) now to schedule a site visit before 16 Nov; bring or send the local sub so they see the 61,000 sq ft dam/lane area, the 10,315 sq ft trail lot, gates and the shoveling spots.
- Pull together up to three snow removal or grounds references from the past three years (prime contracts only count unless a teaming arrangement is submitted) for survey item 9.
- Gather First Aid/CPR certificates for the crew (the survey marks this one as required), or write a training plan with course name, provider, dates and link.
- Pick your Level 3 Site Safety and Health Officer and start the site-specific Accident Prevention Plan (ENG 6293) and Activity Hazard Analysis so they can go in within 14 days of award.
- Price each storm tier using at least the SCA wage rates and $5.92/hour health and welfare from WD 2015-4103 Rev 36, plus vacation and holidays; fill every line of the bid schedule (blank entries are rejected).
- Fill out the Solicitation Survey for W912WJ27QA006 completely, sign SF 1449 block 30a, and watch SAM.gov for amendments (SF 30s) that must be signed and returned with the quote.
Requirements checklist
- Total small business set-aside, NAICS 561730, size standard $9.5 million (SF 1449 block 10 p.1; FAR 52.219-6, Section I p.22)
- Limitation on subcontracting (13 CFR 125.6, services): no more than 50% of the amount paid may go to subcontractors that are not similarly situated. A sub that is a small business under NAICS 561730 is similarly situated on this small business set-aside and does not count against the limit; large-business subs do. (FAR 52.219-14 is not separately listed in the clauses; the limit comes from the set-aside.) (Implied by the small business set-aside; Section I clause list p.22-25)
- Active SAM.gov registration at time of submission; provide UEI and CAGE code (Notice description; Section L SAM Registrations p.37)
- Signed SF 1449 (block 30a) and signed copies of all material amendments (SF 30) (Section L Quote Submission p.36; Section M Step 1 p.40)
- Completed bid schedule: unit price and extended total for all four tasks (8, 5, 3 and 1 estimated events); firm fixed price only, no escalation (Section B p.3-4; Section L Bid Schedules p.36; Section M Step 3 p.41)
- Mandatory Solicitation Survey for W912WJ27QA006, completed in full, including sub name/POC/location (or NONE), teaming arrangement, First Aid/CPR certificates, and past performance within three years (Section C p.5; Solicitation Survey 27QA006.pdf)
- Evaluation on technical, price and past performance; only the prime's past performance counts unless a teaming arrangement is submitted (Section M p.40-42)
- Quote submitted by email to Jennifer.M.Samela@usace.army.mil by 16 Nov 2026, 2:00 PM (SF 1449 block 8; Section L Quote Submission p.36)
- Service Contract Act wage determination 2015-4103 Rev 36 applies; EO 13706 paid sick leave clause included (Section H Wage Determination p.20-21; FAR 52.222-41, 52.222-62, Section I p.22-23)
- Safety per USACE EM 385-1-1: site-specific APP (ENG 6293) by a Competent Person, AHA per definable feature of work, Level 3 SSHO designated on ENG 6282, two First Aid/CPR-certified workers per multi-person shift, daily safety meetings, monthly exposure-hour reports, accident reports on ENG 3394 within 7 days (PWS A.5, Solicitation W912WJ27QA006.pdf p.6-8)
- Pre-work conference with Project Manager and QC personnel physically present before any work (PWS A.6 p.8)
- Equipment able to plow heavy/drifted snow, broadcast snow, and thaw frozen locks; access roads kept at least 16 feet wide; Westville Dam, Storage Building and Marjorie Lane open by 7:00 AM daily (PWS B.3 and B.6, p.11-12)
- Contractor obtains any needed licenses and permits at its own expense (PWS A.7 p.9)
- Security awareness training within 30 days of award; personnel and vehicles subject to search; PIV clause included (Section H p.20; FAR 52.204-9, DFARS 252.204-7004)
- Monthly invoice on company letterhead matching SAM, and invoicing through Wide Area WorkFlow (WAWF) (PWS A.10 p.9-10; DFARS 252.232-7006, Section G p.15)
- Bonding: not stated (Not stated in the solicitation)
- Insurance requirements: not stated (Not stated in the solicitation)
Questions for the contracting officer
Drafts for you to send yourself, through the channel the solicitation names
(contact: Jennifer Samela, jennifer.m.samela@usace.army.mil). No questions deadline is stated; email questions to Contract Specialist Jennifer Samela (Jennifer.M.Samela@usace.army.mil) right away so answers can come back before quotes are due 16 Nov 2026 at 2:00 PM, and do not send them to the technical contact, who is not allowed to answer.
- Is there a required response time after snowfall begins or after a TPOC call-out, beyond having Westville Dam, the Storage Building and Marjorie Lane accessible by 7:00 AM? Does the 7:00 AM deadline also apply to the Grand Trunk Trail Parking Lot?
Why: Response time drives whether equipment and crew must be staged locally and how each storm is priced. (PWS B.6.a.i, vi and vii, p.11-12) - Is any salting, sanding or other ice treatment of roads, the lot or walkways required, or is the scope limited to plowing and shoveling?
Why: Past contracts at this site included salting; the PWS mentions ice and rain loads but lists only plowing and shoveling, and materials change the per-storm price. (PWS B.3 Equipment and B.6, p.11-12) - If the TPOC calls for plowing or shoveling on a storm under 2 inches, is that paid at the Task 1 (less than 6-inch) unit price?
Why: Plowing is required at 2 inches or on TPOC notification, but Task 1 covers all storms under 6 inches; we need to know which events are billable. (PWS B.6.a.i and B.6.c.i, p.11-12; Section B Task 1) - How are storm events defined and reported for billing: when does a multi-day storm count as one event, and how will the contractor receive the official daily measurements from East Brimfield Lake?
Why: Payment is one unit price per event based on final cumulative snowfall, so the event definition decides how many events are paid. (PWS B.6.c.v, p.12) - Are the event quantities in the bid schedule estimates only, with payment only for storms that actually occur, or is there any guaranteed minimum number of events?
Why: Without a minimum, the contractor carries the fixed cost of standing by a crew and equipment all winter. (PWS B.8 Estimated Quantities p.13; PWS A.10 Payment p.9) - Are there any option periods beyond 30 April 2027? Section L refers to completing the bid schedule for 'all years' and Section M discusses evaluating options.
Why: Option years change whether this is a one-winter job or a multi-year contract and how to price it. (PWS A.4 Schedule p.6; Section L Bid Schedules p.36; Section M para 3 p.40) - What is the expected award date, and who is responsible for snow removal for storms that occur after award but before the pre-work submittals are accepted?
Why: Submittals take up to 14 days plus 7-day review cycles, and no field work may start until they are accepted, which could overlap early-season storms. (PWS A.4 Schedule p.6; PWS B.2.a p.11)
Logistics
Westville Lake (Marjorie Lane off South Street, Southbridge, MA, plus the Grand Trunk Trail lot on Breakneck Road, Sturbridge) is about 204 miles from Montpelier, a four-hour drive in good weather. This is on-call work all winter through 30 April 2027, with the main areas open by 7:00 AM and plowing during storms on nights, weekends and holidays, so trucks running from Vermont won't meet the schedule. The practical route is a local small plow sub in the Southbridge/Sturbridge area doing the field work, with Sample Site Works handling the contract, safety plan and QC. A small business sub that is small under NAICS 561730 does not count against the 50% subcontracting limit. The other option is staging a truck and an operator locally for the season.
Not known yet
- How many storms will actually happen; the 17 events in the schedule are estimates only.
- Response time standard beyond the 7:00 AM accessibility requirement, and whether it applies to the Grand Trunk Trail lot.
- Whether salting or sanding is expected (prior contracts at this site included salting).
- Whether there are option years beyond 30 April 2027.
- Award date and how storms between award and acceptance of the safety submittals will be handled.
- Insurance and bonding requirements are not stated in the solicitation.
- No questions deadline is stated.
- FAR 52.219-14 (Limitations on Subcontracting) is not separately listed in the clauses; the 50% services limit is applied here as implied by the small business set-aside.
- Whether a suitable local sub is available and willing to sign a teaming letter before 16 Nov 2026.
Sources: the SAM.gov notice
(view), 3 attachment(s) read: Solicitation W912WJ27QA006.pdf, Attachments 27QA006.pdf, Solicitation Survey 27QA006.pdf Past awards from USAspending.gov. Wage rates from SAM.gov wage determinations. Confirm every detail in the
solicitation before bid work; this packet is a first read, not legal or bonding advice.